What a Complete Maryland HVAC Replacement Proposal Includes

Key takeaway: Three replacement proposals only become comparable once all three state the same scope. Seven items separate a low document from a complete one. They are the mechanical permit and the inspection that follows, written startup readings, the line set with its cleaning and evacuation, the condensate route plus secondary protection above finished space, the electrical work the new nameplate requires, a new pad or mounting, and removal and legal disposal of the old equipment. Ask for each one in writing rather than in conversation. TerraStream Energy puts those seven items on the proposals it writes in Maryland, Prince George's County first.
Reading a Replacement Proposal Line by Line
What a Thin Proposal Leaves Out
A document that names a model number, a price and a start date has described the equipment and almost none of the work. Two companies can quote the identical outdoor unit, the identical indoor coil and the identical variable speed air handler, then send crews to do jobs that differ by a full day of labor and a truckload of material. The gap sits in the lines nobody printed.
Scope is the list of tasks a contractor has agreed to perform for the number at the bottom of the page. On a Maryland changeout the items that go missing are predictable, and they are close to the same seven every time.
The mechanical permit and the county inspection that follows the install
Commissioning, meaning the measurements taken after startup and written down
A new refrigerant line set, or documented cleaning and evacuation of the one already in the wall
The condensate route out of the house, plus secondary protection under equipment sitting above finished space
Electrical work the new equipment requires at the panel, the disconnect and the whip
A new pad or new mounting for the outdoor unit
Removal and legal disposal of the old equipment along with its refrigerant charge
Not one of those is an extra. Each is work the installation needs in order to run correctly and pass an inspection, which means a contractor who left them off the page either absorbed them quietly or planned to bill them later.
You cannot tell which from the page in front of you.
Where the Missing Scope Shows Up Later
Work left off a proposal still has to happen, and it arrives later as a change order, a second visit or a correction you pay for after a failed inspection. Picture the morning of the install. The crew pulls the old condenser, looks at a fused disconnect that does not match the new nameplate, and tells you an electrician needs two hours. You approve it standing in the driveway with the old system already in the truck. Your bargaining position drove off with the old condenser.
Comparison shopping ends at that moment. The number you chose between three documents stops governing the job, and every added item lands at whatever the contractor charges on the day.
Skipped commissioning is quieter and slower to surface. A system charged by gauge pressure alone, with no measured airflow and no recorded subcooling, will heat and cool well enough through a mild October and then run long in July. Nobody connects the August complaint to the hour that was never spent in March. The trade's own installation standard, ACCA Standard 5, treats refrigerant charge verification and airflow measurement as part of installing the system rather than as a service call afterward.
Inspections bite differently. A county inspector who writes up a missing disconnect, an unsupported line set or an improperly terminated condensate line sends the contractor back, and the second trip gets scheduled around the jobs already on the calendar.

Permit and Inspection on the Document
The Mechanical Permit Line
A complete proposal names the mechanical permit, says who files the application and says whether the fee sits inside the quoted number. A heating and cooling changeout is permitted work in Maryland jurisdictions. In Prince George's County the mechanical permit runs through the Department of Permitting, Inspections and Enforcement, and the contractor applying for it has to hold a state license from the Maryland Board of Heating, Ventilation, Air-Conditioning and Refrigeration Contractors.
How the fee is calculated and where the permit falls in the schedule is its own subject. What matters while you are holding three documents is narrower. One of them says permit, one says nothing, and the silent one is cheaper for a reason you can now name.
Ask every contractor, TerraStream Energy included, to put the permit answer on the document instead of in the conversation. The wording does not have to be elaborate. One sentence covers it. Contractor files the mechanical permit application, fee included in the contract price, permit number provided to the homeowner.
Unpermitted work has a long tail. It surfaces at resale, when a buyer's agent asks for the permit record and the county has none, and the repair at that point is a retroactive application on a system that has been closed up behind drywall for years.
Who Meets the Inspector
The proposal should say who schedules the inspection, who is at the house for it and who pays to correct whatever the inspector writes up. Those three answers are separate, and a vague permit line covers at most the first. Ask for all three.
Inspection rarely happens on install day. The equipment runs for days or weeks beforehand, which is normal, and the homeowner who assumed the job ended when the crew drove away is the one who never calls to close the permit out.
Corrections are the part worth pinning down. An inspector who flags the secondary condensate drain or the clearance in front of the service panel has flagged the installer's work, and the cost of putting it right belongs to the installer. Get that in the document. Some homeowners hold a final payment until the inspection passes, and a contractor who refuses to write that down has told you something about how the last ten percent of their jobs go.
Ask for the permit number in writing once it is issued. A number lets you check the record yourself rather than taking a crew's word for it.
The Refrigerant Side of the Install
A New Line Set or a Documented Cleaning
The line set is the component most proposals assume and almost none describe. It is the pair of insulated copper tubes running between the outdoor unit and the indoor coil, usually buried in a wall or a crawl space, and reusing it is the single easiest way to shave hours off a bid.
Reuse can be correct. Diameter has to match the manufacturer's table for that specific model and that run length, because tubing sized for a different system starves or floods the coil and no amount of charge adjustment fixes it. Oil is the other question. A line set that served an older system carries residue from that system's oil, and the refrigerant in the new equipment will not be the same chemistry the industry used ten years ago. The EPA's HFC phasedown rules moved new residential equipment onto lower global warming potential refrigerants such as R-32, and the installation requirements that come with an A2L refrigerant are written into the manufacturer's instructions and the safety standards the mechanical code adopts.
So the honest proposal takes a position. New line set, or existing line set reused, flushed or cleaned per the manufacturer's installation instructions, pressure tested with dry nitrogen, fitted with new insulation and a sealed wall penetration.
Two details separate a careful reuse from a lazy one. Nitrogen flowing through the tubing during brazing prevents the black oxide scale that otherwise flakes loose inside the system and lands in the metering device. New suction line insulation, rated for ultraviolet exposure on the outdoor run, keeps the line from sweating inside the wall cavity.
A proposal that says nothing about the line set has quietly chosen reuse, untested.
Evacuation and the Micron Reading
Evacuation decides whether a new compressor spends the next fifteen years with moisture in it, and a finished job gives you no way to see whether it was done.
Air and water vapor left in the tubing do not stay inert. The synthetic oil in modern compressors pulls moisture out of the air readily, and moisture plus refrigerant plus heat produces acid that works on the windings. Damage shows up years out, which is exactly why the step gets rushed.
Proper evacuation takes equipment and patience. Valve cores come out so the hoses are not breathing through a pinhole. The micron gauge goes on the system itself, at the far end from the pump, because a gauge sitting at the pump reads the pump. A standing target in manufacturer installation instructions is 500 microns, after which the technician valves off the pump and watches for decay. Fast decay means a leak or leftover moisture. Hunt for it instead of adding refrigerant.
Real evacuation on a typical house runs from half an hour to well over an hour depending on line length and ambient temperature. A crew that is done in eight minutes did not do it.
Ask for the micron reading and the decay result to appear on the startup documentation, because that one request changes how the last hour of the job gets spent.
Commissioning and the Startup Readings
Commissioning is the final hour of an install, and it is the first hour a low proposal deletes. The word covers the measurements a technician takes once the system is running, compares against the manufacturer's targets, and writes down.
Only a handful of readings belong in the contract. Refrigerant charge weighed in and then verified by subcooling or superheat, depending on the metering device, which are the two temperature measurements that tell a technician whether the charge is right rather than merely present. Measured airflow across the coil. Supply and return temperatures. Voltage and amp draw against the nameplate rating. A forced defrost cycle watched start to finish, since on a heat pump that sequence only runs in cold weather and a wiring error hides until January. Backup heat staging and any thermostat lockouts set and documented. The condensate float switch tested by filling the pan with water rather than by assurance.
TerraStream Energy writes those readings on a startup sheet the homeowner keeps.
"The last hour on a job is the one that disappears when a price gets cut. We write the superheat, the subcooling, the measured airflow and the amp draw on a sheet before we pack up, and the homeowner keeps a copy, because that page is the only proof the machine was set to the manufacturer's numbers instead of just switched on." Jake Mazzoccoli, Owner, TerraStream Energy
Startup readings sometimes point past the equipment. Static pressure far above what the blower is rated for says the duct system is the restriction, and duct replacement, duct sealing and duct design are not work TerraStream Energy performs, so that finding belongs to a duct specialist. Ask for the static pressure number anyway, since the technician takes it with the same gauge set already hooked to the system.

Site Work the Proposal Should Name
Condensate Route and Secondary Protection
Equipment above a finished ceiling needs two independent ways to handle water, and a thin proposal pays for one. An indoor coil in cooling mode pulls gallons of water out of the air on a humid Maryland afternoon. All of it has to leave the house.
The primary drain is the part everyone quotes without saying so. It needs a trap matched to the blower arrangement, continuous pitch, support so it does not sag into a low spot, and a termination at a point the code accepts rather than at the nearest convenient hole.
Secondary protection is what the cheap document skips. Equipment sitting in an attic or above a finished ceiling gets an auxiliary drain pan underneath, and that pan either drains to a conspicuous place where you will notice water or carries a float switch that shuts the system down before the ceiling gets wet. Both is better. A condensate pump, where gravity drainage is unavailable, needs its own safety switch wired in, not just a plug in an outlet.
Outdoors there is a second water story. A heat pump sheds melt water during every defrost cycle through the winter, and a unit set low on a flat pad will build an ice collar around its base and send runoff across a walkway. Elevation and drainage away from the slab handle it.
TerraStream Energy quotes the condensate route and the secondary protection as part of the install rather than deciding it from a van in the driveway.
Electrical Work the New Equipment Needs
The nameplate on the new equipment sets the electrical requirement, and the circuit feeding the old equipment does not automatically satisfy it.
Everything follows from two numbers on that nameplate. Minimum circuit ampacity sets the wire size. Maximum overcurrent protection sets the largest breaker or fuse the equipment is allowed to sit behind. Change the equipment and both numbers change, which can mean a different breaker, a different disconnect, or a new whip between the disconnect and the unit. A disconnect has to be within sight of the outdoor unit, and plenty of older installs fail that today.
Conversions ask more. A gas furnace draws a modest amount of power for its blower and controls, while an air handler with electric backup heat needs circuits sized for the heaters, and the panel has to have both the physical spaces and the capacity. Whether your panel takes it is a question with its own answer, and the short version is that it depends on the existing service and what else is in the house.
Three proposals will each handle this a different way. One includes the electrical work. Another excludes it and says so in print. The third says nothing and intends to raise it on install day.
Ask each contractor to list the electrical items inside the price, name the items excluded, and state plainly whether a licensed electrician's labor is part of the number. TerraStream Energy puts the electrical scope on the proposal so the line is visible before anyone signs. More detail on how the company approaches full system work sits on its heating and cooling page.
The Pad and the Mounting
A new outdoor unit set on a cracked, settled pad is new equipment on an old foundation. Most old slabs have tipped toward the house over fifteen years of freeze and thaw.
Level matters more on a heat pump than it did on an air conditioner. The unit runs through the winter, water moves through its base pan during defrost, and a tipped unit holds that water instead of draining it. Manufacturers publish a levelness tolerance and a required clearance around the cabinet in the installation manual, and both are checkable.
Height matters too. A couple of inches of clearance above grade lets defrost water fall away and keeps the coil out of leaf litter and drifted snow. Composite pads on a compacted bed hold position better than a slab poured flat on topsoil. Where ground space is tight, a wall bracket fastened into structure does the same job, provided the fasteners land in framing and vibration isolators sit between the unit and the bracket.
Write it into the document. New pad set level and raised above grade, or new bracket mounting with isolators, and the old pad removed.
Removal and Disposal of the Old Equipment
The old furnace, the old coil and the old condenser have to leave the property, and the refrigerant inside them is federally regulated.
Refrigerant recovery is not optional. Under EPA Section 608, a certified technician has to recover refrigerant from appliances before they are disposed of, and venting it is illegal. A homeowner who ends up hauling an old condenser to a scrap yard has inherited a problem that was supposed to be the installer's.
Disposal scope reaches past the two big boxes. Old sheet metal transitions, the removed line set if it was replaced, the old pad, the old thermostat, the packaging the new equipment arrived in, and on a conversion the vent pipe that came out of the chimney or the sidewall. Any of it can be left in a garage by a crew in a hurry.
Watch for the phrase that moves the work to you. Customer to dispose of existing equipment is a real line on real proposals, and it reads as nothing until there is a furnace in your basement with no legs.
TerraStream Energy recovers the refrigerant from the old system and removes the equipment and debris as part of the install.
Turning Three Documents Into a Comparison
Asking for Each Item in Writing
Three proposals become comparable the moment all three answer the same written list. Send one email, to all three, on the same day, and ask for a revised written proposal rather than a phone call back. A verbal yes is worth nothing in November when the crew is on site.
Ask for the model numbers of both the outdoor unit and the indoor unit, plus the AHRI certified reference number for the pair. That number lets you look the combination up yourself in the AHRI Directory and confirm the rated performance belongs to the matched system rather than to the outdoor unit alone. SEER2 and HSPF2, the current cooling and heating efficiency ratings, apply to a specific pairing.
Ask whether a Manual J load calculation was performed, meaning a room by room calculation of how much heat the house loses and gains, rather than a size copied off the old nameplate.
Incentives deserve one careful question. Programs and federal credit rules change from year to year, so ask which program a contractor believes the equipment might qualify for, then confirm current terms yourself with the Maryland Energy Administration and with ENERGY STAR before you count on anything. No contractor controls the outcome of an incentive application.
Scope item | How a thin proposal reads | What to ask for in writing |
|---|---|---|
Mechanical permit and inspection | No mention, or the word permit with no owner attached | Contractor files the application, fee included, permit number given to homeowner, contractor corrects any inspection item at no charge |
Commissioning readings | Startup and test included | Written startup sheet listing charge method, subcooling or superheat, measured airflow, supply and return temperatures, amp draw, forced defrost test |
Refrigerant line set | Silent, which means reuse | New line set installed, or existing set cleaned per manufacturer instruction, nitrogen pressure tested, evacuated to a stated micron reading with a decay test, new insulation |
Condensate and secondary protection | Connect to existing drain | New primary drain with correct trap and pitch, auxiliary pan under equipment above finished space, float switch tested with water, pump with safety switch where required |
Electrical work | Reconnect to existing power | Breaker, wire and disconnect sized to the new nameplate, new whip, backup heat circuits on a conversion, electrician's labor stated as included or excluded |
Pad or mounting | Set unit on existing pad | New pad or bracket, set level to the manufacturer tolerance, raised above grade, isolators fitted, old pad removed |
Removal and disposal | Customer to dispose of existing equipment | Refrigerant recovered by a certified technician, all removed equipment, metal and packaging hauled from the property |
Seven scope items, how a thin proposal handles them, and the wording to request
What the Exclusions Page Tells You
The exclusions page is the most honest part of a proposal, and the thinnest documents do not have one.
A contractor who lists what is not included has thought about the job. Duct replacement, duct sealing and duct design sit outside what TerraStream Energy does, so a homeowner whose duct system needs attention brings in a specialist for that portion and keeps it separate from the equipment contract. Air filtration equipment, humidifiers and air purifiers are their own products and their own labor. Electrical service upgrades, drywall repair along a new line set path, and anything behind a wall that nobody could see from the basement all belong on that page too.
Exclusions stated in advance cost you nothing. The same item discovered on install day costs you a decision made under pressure.
A document with no exclusions and no scope detail is simply less specific, and the specificity gets settled later by whoever is holding the tools. Compare exclusion lists before you compare totals. The proposal with the longest exclusion page is sometimes the one written by the person who actually walked your crawl space.
Price belongs last in that reading order. A conversion costs more than a like for like swap, a complete scope costs more than a partial one, and the useful question is whether the higher document is higher because it contains work the other two will charge for in March anyway. The Department of Energy's guidance on heat pump systems ties what the equipment delivers in a house to how carefully it was sized and installed.
How TerraStream Energy Would Approach This
TerraStream Energy converts Maryland homes off gas and oil heat onto electric heat pumps, with Prince George's County as the first market for that work. A conversion carries more scope than a swap, and the proposal has to show it. The indoor equipment changes from a gas furnace to an air handler with electric backup heat, the electrical requirement grows, the gas line to the furnace gets capped, and the venting that served it comes out of the chimney or the sidewall. Each of those is a line on the document rather than a surprise on day two.
TerraStream Energy also replaces aging furnace and air conditioner pairs, and aging heat pumps, with new high efficiency systems. The checklist does not change for a straight replacement. Permit, line set, evacuation, startup readings, condensate, electrical, pad and disposal all apply whether or not the fuel changes.
TerraStream Energy installs Daikin and Goodman equipment, and the model numbers for both the outdoor and the indoor unit go on the proposal along with the AHRI reference for the pair, so a homeowner can verify the matched combination without asking anyone's permission.
The rest is procedure. TerraStream Energy states the line set decision on the document instead of leaving it to the installing crew. Startup readings get written down and a copy stays in the house. The exclusions get listed, which is the part of a proposal that tends to go missing.
A homeowner holding two other documents can call 703-772-5970, or use the contact page, and ask for the same seven items answered in writing. The answers come back on a document you can set beside the other two and read line for line.
Frequently Asked Questions
What does commissioning mean on an HVAC installation?
Commissioning is the set of measurements a technician takes after the system starts, compares against the manufacturer's targets, and records. On a heat pump that list covers refrigerant charge verified by subcooling or superheat, measured airflow across the coil, supply and return temperatures, voltage and amp draw against the nameplate, a forced defrost cycle watched from start to finish, backup heat staging, and a condensate float switch tested with water. Ask for the readings on a written startup sheet you keep. A proposal that promises startup and test without naming the readings has promised very little.
Does the contractor have to replace the refrigerant line set?
Not always. An existing line set can be reused when its diameter matches the manufacturer's table for that model and run length, and when it is cleaned or flushed per the installation instructions, pressure tested with dry nitrogen, properly evacuated, and refitted with new insulation. Reuse becomes a problem when the proposal is silent about it, since silence usually means the old tubing goes back into service untested. Residue from the previous system's oil matters too, because new equipment runs on different refrigerant chemistry. Ask each contractor to state new line set or reused line set with the cleaning and testing steps written out.
Who pulls the mechanical permit on a Maryland HVAC replacement?
Equipment replacement is permitted work, and the permit application is normally filed by a licensed contractor rather than by the homeowner. In Prince George's County that application goes to the Department of Permitting, Inspections and Enforcement, and the contractor has to hold a license from the Maryland Board of Heating, Ventilation, Air-Conditioning and Refrigeration Contractors. What belongs on your proposal is the answer in writing, naming who files, whether the fee is inside the price, who meets the inspector, and who pays to correct anything written up. Ask for the permit number once it is issued so you can check the record yourself.
Will a new heat pump need electrical work?
Often, yes. The new equipment's nameplate lists a minimum circuit ampacity, which sets wire size, and a maximum overcurrent protection rating, which sets the largest allowable breaker or fuse. Those numbers change with the equipment, so the breaker, the disconnect or the whip may all need replacing. A gas to heat pump conversion adds more, since an air handler with electric backup heat needs circuits sized for the heaters and panel space to put them. Ask each contractor to list the electrical items included, the items excluded, and whether an electrician's labor sits inside the quoted number.
How do I make three HVAC proposals actually comparable?
Send all three contractors the same written list on the same day and ask for revised written proposals, not verbal answers. Request the outdoor and indoor model numbers plus the AHRI certified reference number for the pair, whether a Manual J load calculation was done, and a yes or no on each of the seven scope items, which are permit and inspection, startup readings, line set handling, condensate and secondary protection, electrical work, pad or mounting, and disposal of the old equipment. Then compare the exclusion pages before the totals. Differences in scope explain most of the gap between a low number and a high one.
What should the proposal say about hauling away the old equipment?
It should say the contractor removes it. Refrigerant has to be recovered by a certified technician before an appliance is disposed of, under EPA Section 608, and venting it is illegal. Disposal also reaches past the furnace and condenser to the old coil, the removed line set, the old pad, sheet metal transitions, the old thermostat, the packaging, and on a conversion the vent pipe taken out of the chimney or sidewall. Watch for the line that reads customer to dispose of existing equipment, because it moves all of that onto you after the crew has gone.
Sources
ACCA Standards and Technical Manuals, including Standard 5 HVAC Quality Installation
EPA Section 608 of the Clean Air Act, Refrigerant Management Requirements
Prince George's County Department of Permitting, Inspections and Enforcement
Maryland Board of Heating, Ventilation, Air-Conditioning and Refrigeration Contractors




Comments